Divisional Secretary Robert Hayden has written to the Federal Infrastructure Minister Anthony Albanese calling on him to instigate a genuinely independent enquiry to investigate the current resleepering practices before a tragedy happens.
Despite the more than $500 million spent by the government-owned Australian Rail Track Corporation (ARTC) the Sydney – Melbourne rail corridor is still in a dangerously neglected state
Self-regulation by the ARTC has failed and the RTBU warns that without direct immediate intervention, drivers may be forced to refuse to operate the rail corridor due to health and safety concerns.
The continued denial of the problem by ARTC has forced the union to demand that the minister intervene directly.
The union has been campaigning for more than 12 months for Federal Government action to fix the southern track and ensure that future resleepering projects on the national network are carried out to the highest possible standard.
The lack of action has far-reaching consequences not just for safety, but also in productivity losses for businesses that rely on the rail link and the taxpayer funds that are wasted on continuously patching problem spots rather than fixing them for the long term.
The money-saving ‘side-insertion’ method of resleepering has left the track riddled with mudholes as the poor-quality ballast is crushed by the weight of the concrete sleepers and washed away by rain. At some times, more than 70% of the track has speed restrictions imposed – causing costly delays for commuters and freight.
The bouncing and swaying of the train over the mudholes, combined with temperature variations that expand and contract the metal, are causing the rails to split – and drivers warn it’s only a matter of time before a train meets a break in the track at speed and a serious derailment occurs.
RailCorp have recently sought to commission the above vehicle, which is a converted 600 class rail motor, to be utilised as a track inspection vehicle for predominantly metropolitan usage with some limited outer metropolitan work.
Originally RailCorp intended to operate this vehicle without a train driver, as they do their other track vehicles, despite the fact that is a two-car consist and therefore a “train”. The RTBU disputed this and has succeeded in having this work made available to drivers. An expression of interest has recently been circulated for Inter City drivers to fill this role.
Subscribe
Hot Topic
The Airport Wars
Traffic gridlock, air travel delays, lost jobs, slowed economic growth and a return to the concentration of aircraft noise that plagued Sydney in the 1990s – according to a new study this is the scenario facing Sydney if immediate action is not taken to build a second airport in Sydney.
Latest Campaigns
RailCorp Train Crew Reform
Tags
RSS Feed
- 12 hour train driver shifts maintained in NSW May 18, 2012
- Deadly consequences of taking train drivers’ sleep May 18, 2012
- Rail safety standards must be maintained May 17, 2012
- Unions pledge a national campaign to protect workers in insecure jobs May 16, 2012
- Say NO to the attack on Workers Compensation May 16, 2012